Idle No More World Day of Action Idaho Solidarity


Idle No More Bear Blockade

Urgent Alert and Update:

[The contracted hauler Mammoet is transporting two ConocoPhillips wastewater evaporators manufactured in Newburg, Oregon, to northern Alberta tar sands operations via Highway 12 in Idaho starting Wednesday night, January 30.  Each megaload weighing 255,600 pounds and measuring 20 feet tall, 16 feet wide, and 141 feet long will depart the Port of Wilma, across the river from Clarkston, Washington, on separate nights and travel as far as possible toward the Montana border between 10 pm and 5:30 am, depending on road and weather conditions.  The Idaho Transportation has not announced when the second load will similarly ravage Nez Perce lands, the Middle Fork Clearwater/Lochsa wild and scenic river corridor, area highways, and traveler safety.  Two pilot vehicles and flagging teams will accompany both shipments and limit traffic delays to less than 15 minutes.

On Wednesday and successive evenings, January 30 and beyond, Wild Idaho Rising Tide (WIRT) monitoring and protesting carpools provisioned with video and still cameras, audio recorders, and notebooks will converge at 9 pm at the corner of Second and Washington Streets in Moscow, to demonstrate our megaload opposition at 10 pm along Idaho Highway 128 near Lewiston.  Citizen monitors will then follow each shipment to their stop-over point, likely near Kooskia, where they will park during the day.  Because Mammoet’s transportation plan prohibits these transports from delaying other highway vehicles for more than 15 minutes before pulling over to let traffic pass, we intend to also scrutinize their every move on their second nights traveling toward milepost 139 east of Lowell, and on their third nights in Idaho, struggling over the Bitterroot crest and the Idaho/Montana state line, toward the Lolo scale in Montana.  All of our plans are subject to the constantly changing dynamics of weather and terrain.  For more information and to RSVP as a megaload monitor and protester, contact Wild Idaho Rising Tide at wild.idaho.rising.tide@gmail.com, through facebook, at the WIRT Activist House between noon and 8 pm daily, and/or at 208-301-8039.] Continue reading

Advertisements

Another View on U.S. Highway 95


Victoria Seever, Moscow

The Moscow-Pullman Daily News 1/30/13

On January 21, I got a tour of Highway 95’s other alignment options, the central and west routes. This is not an easy call. Whichever route, it is essential all ecological mitigations are thoroughly taken and maintained. Social and economic issues remain a huge consideration for individual rights and land use. It’s not as simple as buying out someone who just plops down somewhere else equitably located and available.

It was especially helpful to see the road course for the central route and where it is in relation to the east route.

Hearing firsthand the challenges that occur when a highway cuts through a producing field, like farming equipment accessing those fields, and a firsthand history of land use and conservation on it offers valuable insight. Continue reading

Megaloads Will Be Moving on U.S. Highway 12 in Idaho


Two megaloads will be traveling on U.S. Highway 12 in north central Idaho this week, creating traffic delays as long as 15 minutes.

The first is expected to leave the Port of Wilma just west of Clarkston at 10 pm today and travel an unspecified distance toward the Montana border, according to a news release issued by the Idaho Transportation Department in Boise.

The second rig will depart on a different day that has not been set, because it is dependent on the weather. Continue reading