According to Spokane television media sources shared by a core Wild Idaho Rising Tide (WIRT) activist, one of at least three half-million-pound megaloads heading to an oil refinery near Blaine, northwest Washington, will move from the Idaho panhandle into Washington at 7 pm this evening, Friday, April 14 [1]. The Washington State Department of Transportation and the huge size of the boiler and truck/trailer combination, together weighing 480,000 pounds and measuring 213 feet long and almost 22 feet wide, require that this megaload only moves during overnight hours on a route avoiding low, interstate overpasses and bridges that may not withstand its weight.
The megaload will travel along Washington Highway 290 and Trent Avenue, south on Pines Road to the Interstate 90 westbound lanes, then exit onto Broadway Avenue in Spokane [2]. After turning south on Fancher, it will proceed west onto Third then Second Avenues past Altamont, before re-entering the westbound interstate. Detouring through Cheney on Washington Highway 904, the megaload will take I-90 south to the Country Travel Plaza at Highways 395 and 26, where it will stop for the day. Please see the following media coverage, megaload route map, and facebook posts, and join Spokane and north Idaho activists for multiple protests of this fossil fuel infrastructure, starting at the Trent and Pines intersection at 7:30 pm. Continue reading