Lend an ear to news about the weather-influenced cancellation of the first Imperial Oil megaloads to move after their December 6 collision on Highway 95 and subsequent revision of their hauler Mammoet’s transportation plan as well as a description of the transport schedule, route, and dimensions of an oversize hydroelectric plant pipe built by Selway Corporation and transported to Snoqualmie Falls, Washington, in U.S. 95 ExxonMobil Tar Sands Shipments Scheduled for Tonight Postponed and Westbound U.S. 12 Megaload Scheduled for Tomorrow Night between 13:08 and 10:39 on the KRFP Radio Free Moscow Evening Report, U.S. 95, on Thursday, December 15, at http://radiofreemoscow.org/2011/12/20111215/.